Revision of Niseko Town Bridge Life Extension Repair Plan

    

Niseko Town, from the viewpoint of extending the life of road bridges, reducing maintenance costs and leveling out the costs (during the fiscal year), a repair plan for extending the life of Niseko Town bridges was formulated in FY2013. In addition, in accordance with the bridge inspection method changed by the Road Law revision in 2013, bridge inspections have been carried out since 2015.To reflect the inspection results in the Niseko Town Bridge Life Extension Repair Plan, the same plan was adopted. Will be revised.

Please see the attached document for the contents of the Niseko Town Bridge Life Extension Repair Plan (Revision).


 

Inquiries regarding information on this page

Civil Engineering Management Section, Urban Construction Division
TEL:0136-44-2121
FAX:0136-44-3500