About approval (permission) application

When building or constructing a building or building in the Niseko Town Scenic Area after July 1, 2009, or performing development activities, an application for approval (permission) is required before construction starts. You.
Please refer to the following page for buildings etc. that require certification (permission) application.
When planning, there are various regulations etc. Please consult in advance.
The attached documents required for application for approval (permission) are as follows.

Note: For various types of downloads, you can do from the style collection page.

Documents necessary for application for certification of buildings and accompanying document

Types of documents / drawingsScaleMatters to be specified
Certification application form · Landscape law enforcement regime Form 2 (original copy 1 copy, duplicate copy 1)
Outline of construction plan etc. · Law Enforcement Regulations Enforcement Form No. 3
Position diagram (near sketch drawing) (Note)1/2, 500 or more· Those indicating the location of the premises of the building and the circumstances surrounding the premises (those indicating roads and targeted features and the location of the buildings on adjacent land)
Placement diagram (Note)1/500 or more· Indicate the location of buildings in the premises (separate buildings and other buildings pertaining to the application, high and low of the land and the position of the road in contact with the premises, describing the outer wall retreat distance)
Building facility location map1/500 or more· Location diagram of building equipment to be installed outdoors (It can also be combined with the above layout drawing)
Plan view1/200 or more 
Elevation (Note)1/200 or more· Those with more than two colors that are colored (clearly indicating the Munsell color system and the area of ​​the color used for each roof and wall, the same for building facilities)
Current status color photos (Note)2 or more directions· Status of the premises and surrounding area
Estimated completion figure (Note)Any· Colored ones (pars or similar)
Copy of development action permit ・ Niseko Town Scenic Area Ordinance Article 17 Paragraph 2 (only when the permission of the Ordinance Article 17 Paragraph 1 is received)
Greening planAnyThose that understand the maintenance of existing vegetation and planting plans (in the case of a site where the height of the building exceeds 15m and where greening is positioned with the permission of the Niseko Town Scenic Area Ordinance Article 17 Clause 1)
Greening ratio totalization record ・ Niseko Town Scenic Area Ordinance Enforcement Regulations Separate Style No. 11 (When the height of the building exceeds 15m and in the case of a site where greening is positioned with the permission of the Niseko Town Scenic Area Ordinance Article 17 Clause 1)
Note: It is also possible to apply the Niseko Town Landscape Ordinance attached document for the location map, layout map, location map of building equipment, elevation view, color photograph of the current situation, and completed drawing.

Documents necessary for applications for certification of work products and accompanying document

Types of documents / drawingsScaleMatters to be specified
Certification application form ・ Niseko Town Scenic Area Ordinance Enforcement Regulations Separate style style No. 2 (1 copy, 1 copy)
Outline of construction plan etc. ・ Niseko Town Scenic Area Ordinance Enforcement Regulations Separate Style 3
Position diagram (near sketch drawing) (Note)1/2, 500 or more· Those indicating the location of the site of the work and the circumstances surrounding the site (those indicating the position of the road, targeted features, buildings etc. in adjacent land)
Placement diagram (Note)1/100 or more· Indicate the position of the workpiece on the premises (separate ones of the work related to the application and other buildings, the high and low of the land and the position of the road with which the site contacts)
Elevation (Note)1/50 or more· Those with more than two colors subjected to coloring (Munsell color system and area of ​​colors to be used must be clearly indicated)
Current status color photos (Note)2 or more directions· Status of the premises and surrounding area
Estimated completion figure (Note)Any· Colored ones (pars or similar)
Copy of development action permit ・ Niseko Town Scenic Area Ordinance Article 17 Paragraph 2 (only when the permission of the Ordinance Article 17 Paragraph 1 is received)
Greening planAny・ Those who understand the preservation of existing vegetation and the planting plan (in the case of a site where greening is positioned with the permission of the Niseko Town Scenic Area Ordinance Article 17 Paragraph 1)
Greening ratio totalization record ・ Niseko Town Scenic Area Ordinance Enforcement Regulations Separate Style 11th (in the case of a site where greening was positioned with the permission of Niseko Town Scenic Area Ordinance Article 17 Clause 1)
Note: It is also possible to attach the location map, layout plan, elevation view, current color photograph, and completed forecast map with the attached document of the Niseko Town Landscape Ordinance.

Documents necessary for application for permission of development actions and accompanying document

Types of documents / drawingsScaleMatters to be specified
Permission application form ・ Niseko Town Scenic Area Ordinance Enforcement Regulations Separate Style No.9 (1 copy, 1 copy)
Development plan summary ・ Niseko Town Scenic Area Ordinance Enforcement Regulations Separate Style No. 10
A set of development permission application documents stipulated in Article 30 of the Urban Planning Act (Note 1) (Hokkaido Construction Division Urban Planning Division Urban Planning Division Development Acts Collection) · To have duplicate copies (for municipalities) among application documents to be submitted under the guidance of the development permission system under the Urban Planning Law (April 2008 revised version Hokkaido Construction Ministry Town Planning Division Urban Planning Division) (Note 2) And no new submission is required.
Land use plan drawingAny· Copy of land use plan diagram included in above application
Greening planAny・ Those who understand the preservation of existing vegetation and the planting plan (in the case of a site where greening is positioned with the permission of the Niseko Town Scenic Area Ordinance Article 17 Paragraph 1)
Greening ratio totalization record ・ Niseko Town Scenic Area Ordinance Enforcement Regulations Separate Style 11th (in the case of a site where greening was positioned with the permission of Niseko Town Scenic Area Ordinance Article 17 Clause 1)
  • In addition to the application to Niseko Town, it is necessary to apply to Hokkaido based on Article 29 of the City Planning Act in order to apply for permission for development activities.

About notification of completion (stop) etc. of action

Types of documents / drawingsScaleMatters to be specified
Action Complete (Cancel) Notification Form ・ Niseko Town Scenic Area Ordinance

Inquiries regarding information on this page

City Construction Division City Planning Section
TEL:0136-44-2121
FAX:0136-44-3500