About the management situation of Niseko Town general waste final disposal site

Niseko Town final waste disposal site has been in use since December 2002.
We will disclose the amount of landfill at the final disposal site and water treatment situation and strive to maintain proper and safe maintenance.
Please see the maintenance page of the final disposal site from the following page.

Water quality test results of treated water at Niseko Town final waste disposal site

image

Niseko Town general waste disposal site

At the final disposal site, we regularly water garbage to prevent the scattering and stabilization of landfill waste.
Water that has been sprayed is monitored strictly so as not to leak from the repository, cleaned at the water treatment facility and discharged to the river.
In the town, we have established stringent water quality standards for discharging water.
In order to achieve that standard, the water treatment facility in the repository is purifying water with equipment equal to or higher than that of the sewage treatment facility.
With this facility, the water sprinkled is removed in a clean and safe state so that floating materials and hazardous substances are removed and the water quality of the discharging river is not affected.
 

Landfill status at Niseko Town final waste disposal site

image

Landfill at Niseko Town final waste disposal site

The final disposal site reclaims incineration residue of burnable refuse, unburnable refuse, crushed crushed crushed material.
We can use this facility for a long time as we can reduce garbage and thorough sorting, so please cooperate.

Niseko Town Waste Disposal Site Tour

image

Facility tour

最終処分場の施設見学は、現在受け付けしていません。
For the outline of the facility, please see the following documents.

Inquiries regarding information on this page

Town citizen life department townspeople life staff
TEL:0136-44-2121
FAX:0136-44-3500